Workshops & manufacturing

Job orders, machines and people. A date that holds.

Taktra calculates the expected date of every job from today’s real capacity — machines, people, stoppages, maintenance, materials — and recalculates it the moment something changes.

Opens at once with sample data: no sign-up, no card.

Modules
20
Floor views
2D · 3D · flows
Cover gaps ahead
30 days
Reports
7 · 30 · 90 days

Every morning

The list of what matters, already in order.

The dashboard opens with four numbers — open jobs, late, tight margin, ten-day utilisation — and with “Needs attention”: the things that cannot wait.

  • C-2421 · Sollevamenti Piave: delivery 1 day latePromised 17 Nov · ready on 18 Nov
  • C-2412 · Tecnoagri: delivery 5 days latePromised 11 Nov · ready on 16 Nov
  • 1 gauge with overdue calibrationDigital caliper 0–150 mm · not to be used for inspection until calibrated

Real examples from the “Needs attention” list in the sample workspace.

Taktra dashboard — Workshops & manufacturing
Officine Valbrenta S.r.l. · sample data

Sound familiar?

Four sentences heard on the shop floor every week.

01The customer asks for a date and the answer is “I’ll let you know”.
02The press brake stops and the schedule stays as it was yesterday.
03The only laser operator is on holiday, and you find out on Monday morning.
04Material arrives late and nobody tells assembly.

Inside the app

One system, layer by layer.

Scroll: the screens come apart. Each layer is a piece of the day, and they all read the same data.

20 modules

Twenty modules, one plan.

Every module reads the same data. Record a stoppage or an absence once, and scheduling, job orders and deliveries update themselves.

Control room

What is happening, what to do now and how it went.

Dashboard — Taktra, Workshops & manufacturing
01 · Control room

Dashboard

Open jobs with remaining hours, late deliveries, margins under a day and utilisation for the next ten days. Below: “Needs attention”, your next moves and shift staffing by station.

Action plan — Taktra, Workshops & manufacturing
02 · Control room

Action plan

Your next moves with priority and due date. Whoever coordinates knows what to close today.

Report — Taktra, Workshops & manufacturing
03 · Control room

Report

People, stoppages, maintenance, deliveries, orders and quality over the last 7, 30 or 90 days. Print it or save it as PDF.

Jobs and schedule

From the quote down to each operation.

Quotes — Taktra, Workshops & manufacturing
04 · Jobs and schedule

Quotes

Hours from the routing, cost, price and margin. The date to promise is worked out on the shop’s real load, before you tell the customer. When the customer accepts, the quote becomes a job.

Job orders — Taktra, Workshops & manufacturing
05 · Jobs and schedule

Job orders

Every job with progress, promised delivery and expected date, calculated from today’s real capacity. With “From a customer order” the AI reads the customer’s PDF, photo or email text and prepares the jobs for you to confirm. Excel import also takes messy sheets: the AI recognises the columns.

Scheduling — Taktra, Workshops & manufacturing
06 · Jobs and schedule

Scheduling

Operations assigned day by day to machines, nearest promise first. View by machine or by job, across days, months or years.

Work cycles — Taktra, Workshops & manufacturing
07 · Jobs and schedule

Work cycles

The sequence of stages for each product and the hours per piece. It is the basis of the calculation: a new job starts here.

People

Who is in, who is off, who can cover.

People and cover — Taktra, Workshops & manufacturing
08 · People

People and cover

For every position: how many people are needed, how many there are and what to do when one is missing. Gaps over the next 30 days come with a “Find cover” button.

Absences — Taktra, Workshops & manufacturing
09 · People

Absences

Holidays, leave and other absences on a four-week calendar: who is off, from when, until when. Requests awaiting approval are shown dashed.

Staff and skills — Taktra, Workshops & manufacturing
10 · People

Staff and skills

Who works where, with which skills on three levels and how much leave they have left. With a skills matrix and Excel import.

Floor and machines

The physical space, and everything that stops it.

Department layout — Taktra, Workshops & manufacturing
11 · Floor and machines

Department layout

The workshop floor plan in 2D, 3D or by flows. Every station shows whether it is active, under-staffed or in maintenance, stopped, or closed. The layout is editable.

Machine stops — Taktra, Workshops & manufacturing
12 · Floor and machines

Machine stops

Every stoppage with cause and duration. An open stoppage zeroes capacity until the expected restart and recalculates deliveries at once. Analysis by cause and by machine over the last 30 days.

Efficiency — Taktra, Workshops & manufacturing
13 · Floor and machines

Efficiency

Availability, breakdowns and stop causes for every machine over the last 7, 30 or 90 days, worked out from the stoppages already recorded: nothing new to fill in. Hours lost are also estimated in euros.

Maintenance — Taktra, Workshops & manufacturing
14 · Floor and machines

Maintenance

Due dates, frequencies and statutory inspections. Maintenance that stops a station reduces capacity on the day it is scheduled.

Department mode — Taktra, Workshops & manufacturing
15 · Floor and machines

Department mode

A few things, big: what needs doing today at this station. Full screen, for a tablet or a monitor on the floor.

Materials and quality

What comes in, what goes out and what did not go as it should.

Deliveries and materials — Taktra, Workshops & manufacturing
16 · Materials and quality

Deliveries and materials

Shipments to customers and incoming materials. If a material is late, the linked jobs slip; if a job slips, the shipment is at risk.

Quality — Taktra, Workshops & manufacturing
17 · Materials and quality

Quality

Scrap, rework, complaints and non-conforming supplies, with cause and corrective action. Each entry can be linked to an order.

Gauges and calibration — Taktra, Workshops & manufacturing
18 · Materials and quality

Gauges and calibration

Calipers, micrometers, torque wrenches and lifting accessories, with the date of the next calibration or check. An overdue gauge goes on the list of things to fix.

Configuration

The workshop described once, used everywhere.

Settings — Taktra, Workshops & manufacturing
19 · Configuration

Settings

Skills, positions, machines and departments, cycles, calendar and lists: every entry can be added, edited and deleted. You also choose which modules to show and in what order.

20 · Configuration

Messages

Messages between office and floor, available with a Taktra online account.

Tap a screen to view it at full resolution. Screens show the app’s sample workspace.

A day with Taktra

A Tuesday in the workshop.

Told with the sample workspace data: Officine Valbrenta, eight stations, thirteen people.

07:30

Ten open jobs, two of them late.

The dashboard says where to look: utilisation for the next ten days is at 66%, but two deliveries are past their promise and one has less than a day of margin.

Ten open jobs, two of them late.
07:50

The press brake is down.

Hydraulic fault, technician expected tomorrow. The open stoppage zeroes the station’s capacity until the expected restart: deliveries that pass through it recalculate themselves.

The press brake is down.
08:15

The CNC is one person short.

“Roles to cover” looks thirty days ahead: on Tuesday the 17th the CNC centre is one short. From there you look for cover among those with the skill.

The CNC is one person short.
11:00

The schedule has already moved.

Operations are reassigned day by day, nearest promise first. You see the load machine by machine and utilisation for the next two weeks.

The schedule has already moved.
16:30

You give the customer a real date.

Every job shows the promise and the expected date. When they differ, you know before the customer does, not after.

You give the customer a real date.
Ten open jobs, two of them late.
The press brake is down.
The CNC is one person short.
The schedule has already moved.
You give the customer a real date.

Your vocabulary

Taktra speaks the way you do.

In a workshop Taktra uses workshop words. In other sectors the same functions change name and screens.

In generalIn Taktra, for workshopsWhat it is for
Before the customer says yesQuotesPrice, margin and a realistic date
Work to deliverJob ordersProgress, promise and expected date
The planSchedulingOperations by machine, day by day
How a product is madeWork cyclesStages and hours per piece
Who covers positionsPeople and coverGaps and substitutes
What stopsMachine stopsCause, duration, effect on deliveries
The spaceDepartment layoutFloor plan in 2D, 3D and flows
What comes in and goes outDeliveries and materialsShipments and incoming materials

AI assistant

Ask the workshop where it stands.

The assistant queries the floor’s data: jobs, delays, cover, stoppages, deliveries. Write the question the way you would ask a colleague.

Sample question and answer, from the app’s sample data

Which jobs are late?Which stations are uncovered tomorrow?Which stoppages are still open?

The assistant answers only with your company’s data. Every proposal is read and confirmed by you. How it works

3D floor plan

The floor plan, in three dimensions.

It is the floor plan you get in the app: the stations, the state of each one and the flow of work. Drag to turn it and tap a station to see how it stands right now.

Workshop floor plan Officine Valbrenta S.r.l.
100%
Floor plan in the Taktra app for Workshops & manufacturing

Illustrative reconstruction · drag to rotateApp screen · sample data

On the floor and in your pocket

One screen on the floor. The rest on your phone.

Department mode shows operators the jobs at their own station, large and without menus. Everything else runs in the browser on computer, tablet and phone.

One screen on the floor. <span class="serif">The rest on your phone.</span>
Department mode · full screen
Taktra on a phone

Frequently asked

Before you try it in your workshop.

We already have an ERP. Does Taktra overlap?
No. Taktra does not do invoicing, warehouse or accounting: it follows the work on the floor. Job orders can be imported from Excel.
Can we create jobs from the customer’s order?
Yes. In Job orders, “From a customer order”: upload the PDF or a photo of the order, or paste the email text. The AI reads customer, lines, quantities and dates and prepares the jobs; you check them and add them to the schedule.
Does Taktra read times from the machines?
No, it does not connect to machines. Progress and stoppages are recorded by hand, in a few taps.
How precise is the scheduling?
It is an estimate in whole days. It accounts for people present, public holidays, closures, stoppages and maintenance; not for set-ups, overtime or machines running in parallel.
Do we need a tablet at every station?
No. Taktra runs in the browser on computer, tablet and phone. Department mode is designed for a shared screen, but it is not required.

Give your work
its shape.

Thirty days to see whether your team really uses it. Open Taktra in your browser, create your company and describe how you work.

No card needed to start: 30 days free, then you decide whether to subscribe.