Software for operational work

Run the work
in your workshop.

Taktra puts orders, shifts, stoppages and deliveries on one plan and recalculates it when something changes. You know what to do today, who does it and what risks running late.

Pick your sector
Taktra dashboard for Workshops & manufacturing
Taktra dashboard for Food production labs
Taktra dashboard for Restaurants
Taktra dashboard for Retail stores
Real app screen · sample dataOfficine Valbrenta S.r.l.
4sectors, one way of working
82operational modules, 18 to 23 per sector
30days of full trial, nothing locked
0 €per user: flat price up to 50 people

Instant answers

A question? Answered right away.

Taktra’s virtual assistant answers by voice or in writing, in Italian and English, at any hour: pricing, sectors, free trial. If you like, it takes your details and a member of our team writes to you.

Rather we write to you?

It is an AI, not a person: it opens only if you choose to.

Why it exists

On Monday the plan is perfect. On Tuesday someone is off, a machine stops and a customer brings a delivery forward.

By then the real plan lives in a spreadsheet, three chats and the head of whoever coordinates. Taktra is built for that Tuesday.

Before

The plan chases the facts

  • The schedule sits in a file one person keeps up to date
  • Absences are discovered the same morning
  • A stoppage is passed on by word of mouth, and the dates stay as they were
  • “Where are we?” gets asked ten times a day
With Taktra

The plan moves with the facts

  • One plan, shared from the office to the floor
  • Uncovered positions for the next 30 days, with a button to find cover
  • Stoppages and maintenance reduce capacity and recalculate deliveries at once
  • The dashboard lists what to fix today, in order of urgency

One method, four worlds

Your work sets the shape.

Same logic, different vocabulary and screens. Each sector finds Taktra organised around its own way of working.

20 modules

Job orders, machines and a date that holds.

The plan follows each job stage by stage, machine by machine. A stoppage or an absence moves the dates the moment it happens.

  • Expected date calculated from today’s real capacity
  • Machine stops and maintenance inside the same plan
  • Work cycles with hours per piece, stage by stage
Explore Taktra for workshops
Workshops & manufacturing — Taktra
Officine Valbrenta S.r.l. · sample data

A day with Taktra

From surprise to decision.

A Tuesday in the workshop, using the app’s sample data.

07:30

You open the dashboard.

Two deliveries late, one at risk, two open non-conformances and a caliper due for calibration. The “Needs attention” list is already in order of urgency.

You open the dashboard.
08:10

Someone is missing at the CNC.

“Roles to cover” looks thirty days ahead: you see where someone is missing and look for cover from there.

Someone is missing at the CNC.
10:40

The machine stays down.

An open stoppage zeroes capacity until the expected restart and recalculates deliveries at once. Cause and duration stay on record.

The machine stays down.
16:30

You give the customer a real date.

Every job shows the promise and the expected date, calculated from today’s capacity: machines, people, stoppages, maintenance, materials.

You give the customer a real date.
You open the dashboard.
Someone is missing at the CNC.
The machine stays down.
You give the customer a real date.

AI assistant

Ask, instead of searching.

Taktra’s assistant sees only your company’s real data: orders, delays, cover, stoppages, deliveries. Write a question the way you would ask a colleague.

Sample question and answer, from the app’s sample data

Only your data

It answers with what is in your company: nothing made up, no one else’s data.

A base to correct

At first set-up you describe how you work: the assistant proposes stages and stations, you check and edit.

You stay in control

It does not decide for you. Every proposal is read and confirmed by you.

From the office to the floor

Everyone sees what they need.

Same data, different views. On computer, tablet and phone, with nothing to install.

Taktra department mode
Department mode · full screen
Taktra on a phone

Whoever coordinates

The dashboard with the numbers that matter and the list of what must be fixed today.

HR office

Absences and leave balances. Sensitive data is visible only in this view, and a diagnosis is never recorded.

Department head

The same plan without the reasons for absence: who is in, what needs doing, what is stopped.

At the station

Department mode: a few things, big. What needs doing today, here, full screen.

Getting started

Less set-up. More work done.

A guided, self-serve path with no onboarding project to pay for.

  1. Create your company

    Open Taktra in the browser, choose your sector and enter the essentials.

  2. Describe how you work

    You can start from the assistant’s proposal and correct it: stages, stations, numbers.

  3. Start coordinating

    The plan becomes visible to those who need it. You can begin with a single flow.

Clear pricing

One plan. Thirty days to decide.

Every feature, up to 50 people. No per-user price, no set-up fee.

69.90 €per month699 €per year · save €139.80

No card needed to start: 30 days free, then you decide whether to subscribe.

Data in the European Union

Operational data sits on servers in the EU, in an area reserved for your organisation. Encrypted connections.

Your data stays yours

During the trial and the subscription, export to Excel whenever you like. You can save and restore a backup copy.

Payments by Stripe

Your card is entered on a secure Stripe page: the details never touch our servers. Data and security

The essential answers

Before you start.

Do I need to install anything?
No. Taktra runs in the browser on computer, tablet and phone. Adding the icon to your home screen is optional.
What happens after the 30-day trial?
To keep going you subscribe, monthly or annual, and only then enter your card. If you subscribe during the trial you pay from the end of the thirty days; if you subscribe afterwards, the first charge is taken straight away. If you do not subscribe, you pay nothing.
Does the AI decide for me?
No. The assistant answers using only your company’s data and makes proposals: each one is read and confirmed by you.
Can I export my data?
Yes. During the trial and the subscription you export to Excel whenever you like, and you can save and restore a backup copy. Once the trial is over, or once the subscription has ended, the administrator can download for 90 days, from the screen shown at sign-in, a copy of the data entered in the app (a .json file, without uploaded documents, photos and messages); then the data is deleted.

Give your work
its shape.

Thirty days to see whether your team really uses it. Open Taktra in your browser, create your company and describe how you work.

No card needed to start: 30 days free, then you decide whether to subscribe.