Floor, 3D layout and stoppages
The floor, seen from above.
A live floor plan of the workshop, the lab, the kitchen or the store. And next to it, everything that stops it: faults, maintenance, inspections.
Illustrative reconstruction · drag to rotateApp screen · sample data
Illustrative reconstruction · drag to rotateApp screen · sample data
Illustrative reconstruction · drag to rotateApp screen · sample data
Illustrative reconstruction · drag to rotateApp screen · sample data
This is the app’s floor plan, with each sector’s sample data: drag to turn it, tap a station to see its state.
How it works
Space enters the plan.
2D, 3D, flows
Three ways to look at the same space. The 3D view rotates by dragging; the layout is editable.
The status of every station
Active and staffed, under-staffed or in maintenance, stopped or unstaffed, closed.
A stoppage counts
An open stoppage zeroes capacity until the expected restart. Maintenance reduces capacity on its day.
Sector by sector
Workshop, lab, kitchen, store.
The stations change, not the way you read them.
Machine stops with cause and duration.
Laser cutting, bending, CNC, welding, painting, assembly, testing, dispatch: eight stations on the floor plan and the history of their stoppages.
- Time lost over the last 30 days, by cause and by machine
- Availability, breakdowns and restart times for every machine
- Preventive maintenance and statutory inspections
From mixing to dispatch.
Mixing, proving, baking, chilling, filling, packing, dispatch, quality: the lab’s stations with their status.
- Line stops with cause, product change-overs included
- Scheduled sanitation alongside maintenance
- Department mode with the control points to record
The dining room is a tap-to-update plan.
On the floor you tap a table to change its status; in the kitchen the plan shows hobs, oven, pass, cold rooms, wash-up and bar.
- Red border on tables stuck past the threshold
- Covers seated, free tables, in the kitchen, at the bill
- Equipment down with cause and duration
Departments, fitting rooms, tills.
Ten areas on the floor plan: departments, accessories, fitting rooms, windows, office, stockroom and three tills, each with its status.
- A till that is down shows at once
- Faults by cause and by station
- Maintenance and inspections with due dates
Up close
What stops the work.
Every stoppage, with its reason.
Faults, waiting, set-ups, staffing, quality: hours lost by cause and by machine say where to act first.
How much the machines really run.
Availability of every machine, breakdowns, time between breakdowns and time to restart, over the last 7, 30 or 90 days. It is worked out from the stoppages already recorded, with where to start right next to it.
Maintenance and statutory inspections.
What is overdue, what falls due in the next seven days and which statutory inspections expire within thirty. With frequency, last and next run.
Honestly
What it does, and what it does not.
Better to know before you try it.
- Shows station status on the floor plan
- Records stoppages with cause and duration
- Reduces capacity for stoppages and maintenance
- The 3D view is an indicative reconstruction, not a scale survey
- It does not connect to machines or sensors: stoppages are recorded by hand
- It does not replace any maintenance register required by law
Frequently asked
In short.
Can I draw my own floor?
Is the 3D view interactive?
Is hardware needed on the floor?
Give your work
its shape.
Thirty days to see whether your team really uses it. Open Taktra in your browser, create your company and describe how you work.
No card needed to start: 30 days free, then you decide whether to subscribe.







