Frequently asked questions

What people ask before they try.

Search by word or pick a topic. If the answer is not here, ask our virtual assistant: it answers straight away.

Getting startedHow long does it take to get going?
Two minutes to configure, one afternoon to load the jobs in progress. You describe how you work, Taktra derives the stages and stations, and you correct the numbers from there. There is no implementation project to pay for.
Getting startedCan I see it working before I sign up?
Yes. The demo opens straight away in your browser with a sample company: no account, no card. Pick your sector, click and change anything you like; your changes stay in your browser only. When you are convinced, create your account and the 30-day free trial starts.
Getting startedWe already have an ERP. Does this overlap?
Almost never. ERPs know what was ordered and what was invoiced; what happens between the first cut and the loading bay is usually invisible to them. Taktra covers exactly that gap.
Getting startedMy sector is not one of the four. Can I use it?
Yes. The four sectors are starting set-ups: they change the names, not the calculation. Describe how you work in your own words, Taktra derives the stages and then you correct them.
Getting startedDo I need to install anything?
No. Taktra runs in the browser on computer, tablet and phone. If you want the icon on your desktop or home screen, adding it takes a minute: see the next question.
Getting startedHow do I put Taktra on my desktop or home screen?

Computer, with Edge or Chrome. Open app.apptaktra.com and sign in: at the bottom of the side menu there is “Install the app”. Click it and confirm: Taktra gets its own icon and opens in its own window, like a program. If the button is not there, use the install icon on the right of the address bar. On a Mac with Safari: File menu, “Add to Dock”.

iPhone and iPad. Open app.apptaktra.com in Safari, tap Share, then “Add to Home Screen”.

Android. In Chrome, open Taktra’s menu (☰) and tap “Install the app”, or choose “Install app” from Chrome’s ⋮ menu.

Nothing to download or update: the icon always opens the latest version.

On the floorDo we have to buy devices?
No. In the lightest set-up only the shift lead updates, from the phone they already carry. If you prefer a fixed point on the floor, any tablet on a wall mount will do — nothing industrial or certified is required.
On the floorWhat if the floor does not use it?
That is the real risk, more than the cost. Which is why department mode shows a few things, big, and updates in a few taps. If nobody is using it during the trial month, you simply do not subscribe and pay nothing: the trial needs no card.
On the floorDoes it work on a phone?
Yes. It runs in the browser on phone, tablet and computer: a link, nothing to install.
On the floorCan I print the reports?
Yes. The report can be printed or saved as PDF, over the last 7, 30 or 90 days.
Pricing and trialDo I need a credit card for the trial?
No. You create your account and start working straight away, free for thirty days, without entering a card. The card is only asked for when you subscribe, on a secure Stripe page (we never see your card details).
Pricing and trialWhat happens if I do not decide anything?
You pay nothing: with no card, nothing is charged. At the end of the thirty days the app asks you to subscribe to keep going; if you do not, access stops. The data is kept for 90 days after the end of the trial: if you subscribe within that time you’ll find everything as you left it, and from the end-of-trial screen the administrator can download a copy of the data entered in the app (a .json file, without uploaded documents, photos and messages). After that we delete it, together with the accounts.
Pricing and trialIs it priced per user?
No. There is no cost per individual user: the plan includes up to 50 people. Beyond that, let us talk.
Pricing and trialDo we need a VAT number to subscribe?
No. The subscription can be issued to a company, with a VAT number and electronic invoicing details, or to an individual with a tax code — supervisors and team leads who want the tool for their own department. Only the invoice changes.
Pricing and trialHow do I pay?
By card, through Stripe: you enter it when you subscribe, during the trial or at the end, and it is charged automatically at each renewal, monthly or annual. If you subscribe during the trial, the first charge comes when the thirty days are over; if you then cancel before that day you pay nothing and your trial goes on until it ends. Invoicing details, company or individual, go on the same payment page.
Pricing and trialIs there a discount if I introduce Taktra to another company?
Yes: one month free. For every company that subscribes on your recommendation we apply a €69.90 discount, the price of one month, to your subscription: you will find it on your next payment, monthly or annual. Discounts add up: one month for each company you introduce. Either company just writes to info@apptaktra.com saying who introduced whom, before the new company’s first payment: the discount applies once that payment has gone through. The Pricing page has the full conditions.
DataWhere is our data stored?
Operational data entered in the app is stored on servers in the European Union, in an area reserved for your organisation. During the trial and the subscription you can export it to Excel whenever you want. For requests sent through this website, read the privacy notice.
DataCan I take my data with me?
Yes. During the trial and the subscription you can export to Excel whenever you like, and save and restore a backup copy: do it before the trial or the subscription ends. After that, for 90 days, the administrator can download from the screen shown at sign-in a copy of the data entered in the app (a .json file): it does not include uploaded documents and photos, which you download one at a time from the record they are attached to, or messages, which cannot be exported. Then the data is deleted.
DataWho sees the reasons for absence?
Only the “HR office” view. Other views see who is off and until when, not why. A diagnosis is never recorded.
AI assistantDoes the AI decide for me?
No. The assistant answers and proposes: every proposal is read and confirmed by you.
AI assistantWhat data does the assistant answer with?
Only with your company’s real data held in Taktra: nothing made up, no data from other companies.

Cannot find the answer?

Or write to us

Give your work
its shape.

Thirty days to see whether your team really uses it. Open Taktra in your browser, create your company and describe how you work.

No card needed to start: 30 days free, then you decide whether to subscribe.