Restaurants

One team. A seamless service.

Reservations against capacity, tables that move forward with a tap, the stage slowing the evening down made obvious. And behind it, brigade, suppliers and menu in the same place.

Opens at once with sample data: no sign-up, no card.

Modules
21
Front of house
tap-to-update tables
In the kitchen
bottleneck in view
Menu
food cost · allergens

Every morning

Before service, you know where it will jam.

The service dashboard opens with booked covers against capacity, tables stuck in the kitchen too long, reservations without a table and cooks on duty. Below, “Needs attention”.

  • Table T5 in the kitchen for 31 minutes4 covers · 20-minute threshold: the hot kitchen is the bottleneck
  • 1 expired prep item on the lineCut vegetables · to discard before service
  • Convection oven down: equipment faultFan failure · technician expected tomorrow · menu without oven dishes

Real examples from the “Needs attention” list in the sample workspace.

Taktra dashboard — Restaurants
Trattoria Al Ponte · sample data

Sound familiar?

Four moments every restaurant knows well.

01It is 8:30 pm, the room is full and nobody knows which table has waited longest.
02A party of ten arrives and the tables to join have not been set up.
03The oven breaks at 11 and the evening menu is still the printed one.
04A waiter calls in late and Sunday is left uncovered.

Inside the app

One system, layer by layer.

Scroll: the screens come apart. Each layer is a piece of the day, and they all read the same data.

21 modules

Twenty-one modules, from booking to bill.

Dining room, kitchen, brigade and suppliers read the same data. Here Taktra does not talk about job orders: it talks about tables, covers, shifts and dishes.

Control room

The state of service, at a glance.

Service dashboard — Taktra, Restaurants
01 · Control room

Service dashboard

Covers booked tonight against capacity, tables in the kitchen over 20 minutes, reservations without a table, cooks on duty. Quick access to reservations, dining room and flow.

Action plan — Taktra, Restaurants
02 · Control room

Action plan

Your next moves with priority and due date, ticked off one by one.

Report — Taktra, Restaurants
03 · Control room

Report

People, stoppages, maintenance, deliveries and menu over the last 7, 30 or 90 days. Print it or save it as PDF.

Dining room and service

From booking to bill, table by table.

Dining room and tables — Taktra, Restaurants
04 · Dining room and service

Dining room and tables

The floor plan of the room: tap a table to change its status. Colours follow the service flow and a red border marks a table stuck past the threshold. The room is editable.

Reservations — Taktra, Restaurants
05 · Dining room and service

Reservations

Covers per sitting against capacity, assigned tables and notes on intolerances. Lunch and dinner, today and the coming days, with reservations still without a table.

Service flow — Taktra, Restaurants
06 · Dining room and service

Service flow

From booking to bill: where the tables are and for how long. The stage over threshold is the evening’s bottleneck, and the tables after it are waiting.

Dining room mode — Taktra, Restaurants
07 · Dining room and service

Dining room mode

Full screen, for front of house: tap a table to move it to the next step, with waiting minutes in view.

Kitchen

Stations, tasks and what breaks down.

Kitchen and equipment — Taktra, Restaurants
08 · Kitchen

Kitchen and equipment

The kitchen floor plan in 2D, 3D or by flows: hobs and grill, oven, cold and desserts, pass, cold rooms, wash-up, bar. Every station shows its status.

Today’s tasks — Taktra, Restaurants
09 · Kitchen

Today’s tasks

Prep, events and things to do in kitchen and dining room: who owns them, how long they take and with which material. If someone is absent, their tasks turn red.

Equipment down — Taktra, Restaurants
10 · Kitchen

Equipment down

Every stoppage with cause and duration, and analysis by cause and by station over the last 30 days.

Maintenance and checks — Taktra, Restaurants
11 · Kitchen

Maintenance and checks

Due dates, frequencies and statutory inspections: from probe calibration to periodic checks.

Prep list — Taktra, Restaurants
12 · Kitchen

Prep list

Stocks, sauces and bases to have ready before service. Today’s quantity is worked out from expected covers, minus what is left and still good; whatever has expired on the line must go.

Brigade

Who is in the kitchen, who is on the floor, who covers.

Team and shifts — Taktra, Restaurants
13 · Brigade

Team and shifts

For every position: how many people are needed, how many there are and what to do when one is missing. Gaps over the next 30 days come with a “Find cover” button.

Absences — Taktra, Restaurants
14 · Brigade

Absences

Holidays, leave and other absences on a four-week calendar, with requests still awaiting approval.

Staff and roles — Taktra, Restaurants
15 · Brigade

Staff and roles

Chef, sous chef, cooks, floor and bar: who works where, on which days, with which skills and how much leave they have left.

Menu, pantry and suppliers

What a dish costs, what to order and what gets thrown away.

Menu and food cost — Taktra, Restaurants
16 · Menu, pantry and suppliers

Menu and food cost

Price, production cost, margin and allergens for every dish. Average food cost and dishes above 40% are highlighted; an allergen list is included.

Pantry and reordering — Taktra, Restaurants
17 · Menu, pantry and suppliers

Pantry and reordering

Minimum stock and what is on hand. Today’s and tomorrow’s needs are worked out from booked covers, and the shopping list comes out already split by supplier.

Suppliers and goods orders — Taktra, Restaurants
18 · Menu, pantry and suppliers

Suppliers and goods orders

Orders to suppliers, delivery windows and order cut-offs. If goods are late, service knows first. With returns and outgoing items.

Food waste — Taktra, Restaurants
19 · Menu, pantry and suppliers

Food waste

What gets thrown away, why and what it costs. Ten seconds per entry: after a few weeks the data shows where to act, from the most frequent reason to the most wasted dish.

Settings — Taktra, Restaurants
20 · Menu, pantry and suppliers

Settings

Skills, positions, stations and equipment, calendar and lists. Choose which modules to show and in what order.

21 · Menu, pantry and suppliers

Messages

Messages between kitchen, floor and office, available with a Taktra online account.

Tap a screen to view it at full resolution. Screens show the app’s sample workspace.

A day with Taktra

A Tuesday evening at the trattoria.

With the sample workspace data: Trattoria Al Ponte, sixteen tables, sixty-eight covers.

11:20

The convection oven goes down.

Fan failure, technician tomorrow. The stoppage stays on record with cause and duration, and tonight’s menu goes out without oven dishes.

The convection oven goes down.
15:00

Forty-three covers for tonight.

Reservations show covers against capacity, the intolerances noted and a party of ten still without a table.

Forty-three covers for tonight.
17:30

Who preps what.

Stocks and sauces, temperature checks, the joined table for the group: every task has an owner and a time.

Who preps what.
20:45

Two tables stuck in the kitchen.

The service flow shows where tables pile up. The stage over threshold is the bottleneck: you know where to send a hand.

Two tables stuck in the kitchen.
23:30

With service over, the numbers.

Thirteen dishes on the menu, average food cost at 33.1%, three dishes above 40%. Tomorrow you decide what to adjust.

With service over, the numbers.
The convection oven goes down.
Forty-three covers for tonight.
Who preps what.
Two tables stuck in the kitchen.
With service over, the numbers.

Your vocabulary

Taktra speaks the way you do.

A restaurant has no job orders. Taktra changes vocabulary and adds what a service needs: tables, covers, reservations, dishes.

In generalIn Taktra, for restaurantsWhat it is for
Work to deliverReservations · Service flowCovers, tables and stages up to the bill
The plan of the dayToday’s tasksPrep and events with an owner
Who covers positionsTeam and shiftsKitchen, floor and bar: gaps and substitutes
What stopsEquipment downCause, duration, most affected station
The spaceDining room and tables · Kitchen and equipmentRoom plan and kitchen floor plan
What comes inSuppliers and goods ordersDelivery windows and order cut-offs
The productMenu and food costPrice, cost, margin, allergens

AI assistant

Ask the brigade where a hand is needed.

The assistant queries the restaurant’s data: cover, reservations, stoppages, deliveries. Write the question the way you would ask a colleague.

Sample question and answer, from the app’s sample data

What should I sort out before service?Which kitchen stations need cover?Which reservations have no table?Which equipment is down?

The assistant answers only with your company’s data. Every proposal is read and confirmed by you. How it works

3D floor plan

The floor plan, in three dimensions.

It is the floor plan you get in the app: the stations, the state of each one and the flow of work. Drag to turn it and tap a station to see how it stands right now.

Kitchen floor plan Trattoria Al Ponte
100%
Floor plan in the Taktra app for Restaurants

Illustrative reconstruction · drag to rotateApp screen · sample data

On the floor and in your pocket

A tablet on the floor. The rest on your phone.

Dining room mode puts the tables full screen: one tap and the table moves to the next step. Everything else runs in the browser on computer, tablet and phone.

A tablet on the floor. <span class="serif">The rest on your phone.</span>
Dining room mode · full screen
Taktra on a phone

Frequently asked

Before you try it in your restaurant.

Does Taktra take orders or act as a till?
No. Taktra organises the service — reservations, table status, brigade, tasks, suppliers — but it is not an ordering system or a till.
Can guests book online?
Reservations are entered in Taktra by whoever takes them, with covers, table and notes. There is no public booking form.
How is food cost calculated?
It is the cost of ingredients over the selling price of each dish. You enter price and cost: Taktra shows the percentage, the margin and the dishes above threshold.
Do we need a tablet for every waiter?
No. Taktra runs in the browser on computer, tablet and phone. Dining room mode is designed for a shared screen, but it is not required.

Give your work
its shape.

Thirty days to see whether your team really uses it. Open Taktra in your browser, create your company and describe how you work.

No card needed to start: 30 days free, then you decide whether to subscribe.